Thursday, August 25, 2011
Changeover Installation
When we have two utility meter installed and we want to balance our utility bill by changing the load on Semi-Monthly basis.
This is only beneficial when you have two utility meters installed.
Stuff you need :
1. 4 Pole - 3 way Manual Changeover
2. Wire as per your requirement
3. Electrical Solution Tape
4. Connectors to connect wires to both ends (as per required)
Please see the attached image for your understanding.
When the changeover lever is in up position then meter1 will power your house and When the lever is in middle position the utility power will be totally cutoff and this is beneficial when you have portable generator installed at your house. If the lever is in down position meter2 will power your house.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment